typical configuration is a double wall tank with a closed interstitial space for leak monitoring. A second configuration is an open top rupture basin where the leak space is open. A third configuration is just a single wall day tank which may be installed in a containment dike area.
From 60 to 600 gallons
Each tank is custom designed to fit the requirements of the application
B. J. Muirhead Co., Inc. is pleased to host the upcoming Cleaver-Brooks Boiler Systems PLUS Seminar. This course is designed for boiler operators, maintenance personnel, and front-line supervisory personnel. The overall objective of this course is to make the attendee more knowledgeable about what a boiler is, how it operates, and what ancillary equipment is required to support its operation. Additionally, the program stresses safety and the proper operating practices and maintenance required to maximize an efficient, safe, and reliable operation of the equipment.